1960
The creation of IED-HOLDING
Repair division of the power system of the Republic of Tatarstan
1980
The modernization of the power grid of the Republic of Tatarstan
The launch of "turnkey" equipment in Nizhnekamsk CHP-2, Nizhnekamsk HPP, Kazan CHP-3
2001
International projects
Installation of boiler units, power equipment, repair of existing boiler equipment, turbines and generators
2014
EPC contractor
The construction of the substation 220 kV and 500 kV high voltage cable lines 220 kV