ABOUT THE COMPANY
Services and products
Projects
SUSTAINABLE DEVELOPMENT
Press-center
Contacts
en
ru
all
sites
MENU
8 (843) 572-09-99
fax:
8 (843) 572-09-99
ABOUT THE COMPANY
General
Management
Structure of the Holding
Innovative activities
History
Presentations and company prospects
Services and products
General
Engineering and design
Construction and repair
Electric power & heat generation
Fiber-optic communication line installation
Projects
On map
Main projects
Reference list
Recommendations
SUSTAINABLE DEVELOPMENT
General
Integrated management system
Environmental responsibility
Safety and labor protection
Press-center
General
News
Photo gallery
Contacts
all sites of the holding
Engineering and design
Novosibirskenergyproject
IED- INEL
Branch TatNIPIenergoprom
TatBelEnergoProject
EC EnergoDevelopment
Construction, installation, repair, service
IED - Engineering
M12 Systems
IED-KER (KamEnergoRepair)
IED-Montazh
IED-Promstroy
Power and heat supply
IED - Generation
Branch Zelenodolsk Heat Supply Company
Branch Elabuga Heat Supply Company
Equipment manufacturing
KamEnergoMash
ServiceMontageIntegratcia
TNPP RU - Engineering
IED-Energy
Back to the list
Main
Projects
Main projects
Kazan power plant-3
Kazan power plant-3
Location
Russia, Kazan
Customer
TAIF
Realization time
2015-2017
Completed work
Erection of a waste heat boiler
Erection of Gas Turbine Unit 9HA.01 GE of 386,84 MW with electro generator
Installation of central line and plant auxiliary equipment
Previous project
Islamic Academy, Bolgar
Строительство встроенной котельной 1,5 МВт
Next project
Complex of petrochemical and oil refinery plants for JSC TANECO
Participation in construction of complex of petrochemical and oil refinery plants
Do you need to
implement a similar project?
Connect to us
Connect to us
I agree to my personal data processing under Article 9 of Federal Law N152-FZ “On Personal Data” dated July 27, 2006
Mail