Naberezhnye Chelny heat network
The heat pipe jumper, length 13400 m., d = 1020 mm
Location:
Russia, Naberezhnye Chelny
Realization time:
2005-2006
Types of jobs:
- Design documentation development
- Piling work
- Installation of the Foundation, including movable and fixed supports
- Supply of pipes and valves
- Construction and installation works on laying the heat pipe
- Thermal insulation of joints
- Implementation of the latest automation system using leak detection technology