Substation Osinovo
Reconstruction of substation
Location:
Russia, Kazan
Realization time:
2005-2006
Types of jobs:
- Construction of indoor switchgear-10 kV of the substation "Osinovo" combined with the operational control station with the installation of the cells To-63 in the amount of 32 pieces
- Reconstruction of relay protection devices with the replacement of protection on microprocessor
- Reconstruction of the construction part of the substation with the reconstruction of oil-receiving devices and reinforced concrete fencing of the substation territory.
- Replacement of power transformers TMN-16000/110 on TRDN-25000/100 with a split winding and installed additional input cells 10 kV.
The purpose of the reconstruction is to increase the power from 12,500 kW to 29,150 kW.